Protection of pancreatic islets from oxidative cell death by a peripherally-active morphinan with increased drug safety

Okka Scholz, Elena Huß, Silke Otter, Diran Herebian, Anna Hamacher, Laura Mariana Levy, Stanimira Hristeva, Miguel Sanz, Haresh Ajani, Alfredo Rodriguez Puentes, Torsten Hoffmann, Jens Hogeback, Anke Unger, Susanne Terheyden, Michelle Reina do Fundo, Bedair Dewidar, Michael Roden, Eckhard Lammert

Molecular Metabolism, July 2023, https://doi.org/10.1016/j.molmet.2023.101775

Abstract:

Dextromethorphan (DXM) is a commonly used antitussive medication with positive effects in people with type 2 diabetes mellitus, since it increases glucose tolerance and protects pancreatic islets from cell death. However, its use as an antidiabetic medication is limited due to its central nervous side effects and potential use as a recreational drug. Therefore, we recently modified DXM chemically to reduce its blood–brain barrier (BBB) penetration and central side effects. However, our best compound interacted with the cardiac potassium channel hERG (human ether-à-go-go-related gene product) and the μ-opioid receptor (MOR). Thus, the goal of this study was to reduce the interaction of our compound with these targets, while maintaining its beneficial properties.

Want to know more about this publication? Contact our scientists

Medicinal chemistry

Drug Discovery

Taros’ international and multidisciplinary team has more than 180 years of pharmaceutical R&D experience. Collectively as a team, we worked on more than 120 biomolecular…

custom chemical services

Custom Synthesis

We support our customers by providing first kg quantities of fine and specialty chemicals, cost reduction of existing syntheses, streamlining chemical processes considering…

Looks interesting?

As a leading CRO in Europe, Taros provides comprehensive drug discovery chemistry services for large Pharma and Biotech corporations as well as for Research Institutes and Academia

Our experienced chemists practice a pragmatic culture and customer-centric approach in order to exceed project expectations and, despite challenges, bridge very narrow timelines. They are trained to consider economic, safety and ecological boundaries and conditions laid out for all stages of the project.
Scroll to Top